This highly complex warehouse refurbishment involved transforming the building into 3 interlinked units and creating a 2.5m deep Hypobaric pit for the installation of a pressure vessel used for testing undersea engineering equipment. Two cranes were needed to install this high value equipment.

The coordination of two cranes was needed to lift and install specialist high value equipment.

PROJECT:
Refurbishment of 3 Industrial Units

LOCATION:
E. Sussex

CONTRACT VALUE:
£700,000

DURATION:
21 weeks