Visit our homepage About Trinity Construction Information About Special Works Information About Our Contracts Division Information About Independent Lives Information About Trinity Maintenance Links to other sites Contact Us
 

Contracts Case Study

Project: Complete refurbishment of an existing mews property into 4 contemporary flats

Location: Montagu Mews North, London W1

Client: The Portman Estate

Contract Period: 42 weeks

Value: £708,000

Brief
A complete refurbishment of an existing mixed use large mews property into 4 No. high quality contemporary 1-2 bedroom flats and 1 No. private garage.

Key Issues
This was a very restricted site with strict planning approval, Limited vehicular access and numerous adjoining building owners including a recently refurbished hotel.

The Architects specification called for a modern design including a hardwood staircase with glazed stainless steel balustrade, a Cathedral roof with electronically operated Velux roof windows and high quality Poggenpohl kitchens and CP Hart bathrooms.

The project involved major structural works including mini-piles due to poor ground conditions and extensive brickwork repairs to the existing defective structure.

Outcome
4 individual flats with modern services and contemporary finishes in an existing Victorian building in a local conservation area.

Click the images above for a larger version.

 

Designed by Hughesandco.com