Case Study
Project:
Wetroom with graded floor
Client:
Anchor Staying Put / Private
Brief:
The client received basic grant for work but wished
to include additional facilities and incorporate high
quality fittings and tiling at his own expense.
Key Issues:
Removal of old bath and toilet.
All existing pipework and services to be hidden,
a white graded floor and shower unit to be installed with high quality,
black tiling to all walls and recesses and the old radiator replaced with a new ladder towel rail.
The Result:
A superb, modern wetroom with top quality fittings, suite and tiling. The client had very high expectations and was delighted with the outcome.
|