Project: Internal office refurbishment

Location: Brighton House Brixton
Contract Period: 13 weeks
Value: £125,000

To strip out and refurbish the first floor suite of Brighton House to provide a modern, bright and spacious office environment.

The property was located in the centre of Brixton and was occupied on all floors apart from the first. Trinity worked closely with the remaining occupants to minimise noise, dust and disruption, especially during the initial strip out and sand blasting of the brickwork.

A lowered MF ceiling was fitted to hide the new mechanical and electrical services and to complete the works, a reclaimed pitch pine timber floor was installed.

As the photos show, this fit out utilised the existing period features and provided the client with a highly desirable office space.